Jobsites in motion. Early intel from Yellow Sheet’s latest report—permits, tenders, and active planning across Vancouver Island
VICTORIA – 1041 Summit Ave (multi-family new) Houseplex – Missing Middle Housing
Designer: Hoyt Design Co – Victoria Ph: 250-999-9893 hello@hoyt.co
Surveyor: Summit Land Surveying – Victoria Ph: 250-391-6708 victoria@summitsurveying.ca
Arborist: Talmack Urban Forestry – Talbot Mackenzie – Victoria Ph: 250-479-8733 tmtreehelp@gmail.com
Enquiries: Ryan Hoyt – Ph: 250-999-9893 ryan@ryanhoytdesigns.com
Project: A three-storey infill houseplex bringing four apartment-style units with open living areas, decks, and two parking stalls. Units A and B are 1,151 sf and 1,164 sf with three bedrooms, while ground-level studios C and D are 484 sf and 525 sf. Features include bike storage, vegetable gardens, privacy fencing, and landscaping on a compact .15-acre lot.
Stage: Development permit application was filed in July 2025 under delegated authority review.
DUNCAN – 438 Festubert St (multi-family new) Townhouses
Architect: Pacific West Architecture – Vancouver Ph: 604-558-3064 info@pwaarchitecture.com
Landscape Professional: Homing Landscape Architecture – Vancouver Ph: 778-323-3536 hominglandscape@gmail.com
Civil Engineer: RZ Civil Engineering – Burnaby Ph: 604-880-1198 rzcivilengineering@gmail.com
Surveyor: Underhill & Underhill Land Surveyors – Geomatics – Courtenay Ph: 250-871-4599 island@underhill.ca
Energy Consultant: HBL High Performance Building Lab and Architecture – Vancouver hilu@hblarch.com
Geotechnical Consultant: GeoFoundation Geotechnical Consultant – Burnaby Ph: 604-838-2586 gongzuozhou@yahoo.com
Project: Three townhouse buildings planned at three storeys each, totalling 13 homes with 15 parking stalls on a .33-acre property. The layout combines two triplexes with a seven-unit row, ranging from 1,230 sf to 1,530 sf, in a mix of three- and four-bedroom homes.
Stage: The development permit application, submitted in January 2025, advanced through the Advisory Design Panel in June 2025 and is now under Council consideration.
LANGFORD – 2691 Sooke Rd (mixed-use dev) Apartments – Commercial
Architect: Studio 531 Architects – Victoria Ph: 250-384-2131 tmoore@studio531.ca
Developer: 1287572 BC Ltd – Nurinder Singh – Surrey nurinder.singh@gmail.com
Consultant: Grayland Consulting – Rachael Sansom – Victoria Ph: 250-889-0047 rdsansom@gmail.com
Landscape Professional: Lombard North Group – Victoria Ph: 250-386-3336 lombardnorthgroup@gmail.com
Structural Engineer: Skyline Engineering – Victoria Ph: 250-590-4133 cmaclean@seng.ca
Electrical Engineer: e2 Electrical Engineering – Victoria Ph: 778-433-9391 patrick.lourdu@e2eng.ca
Civil Engineer: On Point Project Engineers Ltd – Victoria Ph: 250-478-7875 rrebneris@oppel.ca
Project: A six-storey mixed-use building combining 66 condominium units with commercial space on the ground floor, supported by one underground parking level.
Stage: Development permit was approved in July 2025, with working drawings expected to begin in the fall of 2025. The rezoning process concluded in August 2024.
Yellow Sheet Construction Data provides meticulously gathered data covering both the private and public sectors of development and construction. Comprehensive and regularly updated reports offer accurate insights into project descriptions, teams, and stages, covering everything from rezoning and development permit applications to tender calls, bid results, and building permits for Vancouver Island and Coastal areas.


