LADYSMITH– 128 Rollie Rose Dr (multi-family new) Townhouses
Designer: Adapt Design – Victoria Ph: 250-893-8127 josh@adaptdesign.ca
Developer: Sharpe Sites Inc – Ladysmith Ph: 250-327-1617 chris.sharpe@shaw.ca
Consultant: Strathcona Forestry Consulting – Shawnigan Lake Ph: 250-743-4064 strathcona.fc@shaw.ca
Landscape Designer: Point Landscape Studio Inc – North Vancouver Ph: 778-868-2378 yyu@pointlastudio.com
Surveyor: Bennett Land Surveying Ltd – Victoria Ph: 250-590-3074 victoria@bennettsurveys.com
Geotechnical Consultant: Lewkowich Engineering Associates Ltd – Nanaimo Ph: 250-756-0355 geotech@lewkowich.com
Water Consultant: TerraWest Environmental – Nanaimo Ph: 866-500-1553 ebell@terrawest.ca
Project: Development of three 2-storey buildings with seven townhouse units on a .47-acre property. The project features one triplex and two duplex buildings.
Stage: Development permit application with variance approved in December 2024.
NANAIMO – 1810 Fremont Rd (industrial add/alter) Light Industrial Addition
Architect: OCA Architects – Vancouver Ph: 604-408-8970 in@oca-arch.com
Developer: Denmar Electric – Nanaimo Ph: 250-758-8464
Civil Engineer: Herold Engineering Ltd – Nanaimo Ph: 250-751-8558 mail@heroldengineering.com
Project: A 2-storey, 4,400 sf addition to an existing light industrial office building.
Stage: Development permit application submitted in December 2024.
COURTENAY – 407 4th St (mixed-use dev) Apartments – Commercial – Heritage Lane
Architect: Alvin Reinhard Fritz Architect – Lethbridge Ph: 403-320-8100 general@alvinfritzarchitect.com
Developer: Renwest Investments Ltd – Courtenay Ph: 250-338-2414 info@monterrabuilders.ca
General Contractor: Monterra Projects Ltd – Courtenay Ph: 250-338-2414 garry@monterrabuilders.ca
Project: The development includes 36 apartment units and four commercial retail units on a property featuring one underground parking level with 31 stalls. Unit sizes range from 876 sf to 1,108 sf, offering micro units and three-bedroom apartments.
Stage: Working drawings are underway, and a building permit application has been submitted for a planned construction start in April 2025. The development permit was approved in December 2024.
Yellow Sheet Construction Data provides meticulously gathered data covering both the private and public sectors of development and construction. Comprehensive and regularly updated reports offer accurate insights into project descriptions, teams, and stages, covering everything from rezoning and development permit applications to tender calls, bid results, and building permits for Vancouver Island and Coastal areas.