GREEN SHEET FRASER VALLEY BUILDING BRIEFS: MAY 20, 2025

May 20, 2025

Location: Surrey (industrial new)

    • Address: 12900 87 Ave – Industrial – Office – MA Stewart
    • Description: New industrial development – 3 storeys – single tenant industrial building – industrial, approx 5,797 sm – office approx 1,203 sm – approx 7,000 sm total – high albedo roof, tilt up construction
    • Status: Construction Start – drywall, T bar ceilings, lighting, flooring, millwork, interior glass and doors, exterior patios, rooftop patio and amenity space underway
    • Contact 1: KCC Architecture & Design – 300 15300 Croydon Dr, Surrey V3Z 0Z5 604-283-0912
    • Contact 2: Ram Construction Inc – 8369 River Way, Delta V4G 1G2 604-940-5265

Location: Surrey (industrial new)

    • Address: 5674 192 St – Industrial – City Wide Produce
    • Description: New light industrial building – 2 units – unit 1 approx 1,556 sm – unit 2 approx 900 sm – office – mezzanine – build to suit units – 24 parking spaces – tilt up construction
    • Status: Construction Start – structural steel underway – tilt up complete
    • Contact 1: Architecture Panel Inc 206 1493 Foster St, White Rock V4B 0C4 604-783-1450
    • Contact 2: Orion Construction– 105 19923 80A Ave, Langley V2Y 0E2 604-362-2994

Location: Maple Ridge (multi-family new)

    • Address: 12137 Edge St – Condominiums – Edge 3
    • Description: New multi family development – approx 4 storeys – 48 condominium units – u/g parking
    • Status: Construction Completion – 24-Dec
    • Contact 1: Garcia Zunino Architects – 662 Windsor Rd E, North Vancouver V7N 1K7 604-987-8304
    • Contact 2: Baydo Development Corp– 36 102 Cope Cr, Saskatoon S7T 0X2 306-986-0244

Location: Chilliwack (multi-family new)

    • Address: 43690 Parkstone Way – Rowhouses – Townhouses – Parkstones – Cedarbrook Master Plan
    • Description: New multi family development – 3 bedroom units – 1,756 sf to 1,800 sf – wood frame construction – central air conditioning – artificial turf yards – 10 acres of park space, including fenced dog park, childrens play area, splash park – access to community building which includes dance and fitness studios, social gathering space, outdoor gathering space
    • Status: Construction Start – Phase 3, underway – framework for various structures currently underway
    • Contact 1: Rositch Hemphill & Associates Architects – 10 120 Powell St, Vancouver V6A 1G1 604-669-6002
    • Contact 2:Westbow Construction– 401 44561 Skylark Rd, Chilliwack V2R 6J6 604-490-3451
  • Building Briefs are submitted by Green Sheet Construction Data

 

* indicates required
The Business Examiner South Vancouver Island provides business news, advice, and data for the following communities:Brentwood Bay, Central Saanich,Colwood, Esquimalt, Highlands, James Bay, Langford, North Saanich, Oak Bay, Saanich, Sidney, Sooke, Victoria,and View Royal
Share This